Mare Island Background and Infrastructure Docs

Significant investigations and studies have been undertaken on the North Mare Island (NMI) site over many years. Below are links to the environmental conditions, past site assessments, technical reports, and infrastructure studies.

Environmental Conditions

Parcel XV-A Finding of Suitability to Transfer FOST - January 2001
Parcel XV-A Deed - September 2001
Parcel XV-B(2) Deed and Finding of Suitability of Transfer FOST - January 2009
Parcels II, X-B(1) and X-B(2) Deed and Finding of Suitability to Transfer FOST - April 2011*
Parcel XV-B(1) Navy Map - September 2013
Navy Brief on Environmental Status - May 2014

* - Parcels X-B(1) and X-B(2) are located on the south/west side of Mare Island. Although they are not part of North Mare Island, they were transferred at the same time as Parcel II.

Current Site Assessments and Technical Reports

Public Meeting on Mare Island Infrastructure Assessment Project Recording of meeting on 090424
Public Meeting on Mare Island Infrastructure Assessment Project Slides from 090424 Presentation
Pre-Project Hydrology Study - November 2016
Biological Resources Assessment - December 2016
Existing Conditions Report - May 2017
Existing Noise Report - May 2017
Geotechnical Investigation Report - May 2017
Cultural Resources Memorandum - May 2017
BKF Mare Island Drainage Report - August 2019

Geotechnical Conditions

Preliminary Geotechnical Engineering Study - January 2001
Geotechnical Design & Materials Report: Mare Island/Route 37 Project - March 2003
Preliminary Geotechnical Cost Summary - March 2006


Infrastructure Studies

Community Facilities District (CFD) FAQs
Mare Island Transportation Plan: Final Report - August 1997
Legacy Partners Infrastructure Estimates - November 1997
Legacy Partners Business Park Infrastructure Cost Breakdown - November 1999
Vallejo Transportation and Mare Island Access Study: Executive Summary - January 2001
Vallejo Transportation and Mare Island Access Study: Final Report - January 2001
Mare Island Utilities, Operations, Maintenance and Capital Improvement Plan (MIRIS) - July 1997
Water, Sanitary Sewer, and Storm Drain Master Plans - July 2001
SR-37 Interchange Project Study Report - August 2001
Mare Island Utility Reuse Plan - February 2002
Mare Island Water Model - April 2003
SR-37 Interchange Modification Cost Estimate - December 2003
Mare Island Water Model - June 2005
Water Supply Assessment - June 2005
Touro University Project 1 - Preliminary Off-Site Infrastructure Estimate - September 2007
Touro University Project 2 - Off-Site Improvements - September 2007
Touro University Development Agreement - Infrastructure Cost Estimate - August 2008

Site Powered by: Civiclive © 2004-2024